Normand

Since 1950
Home Categories Power tools Power Tool Accessories Track Saw Accessories

Track Saw Accessories

Set Descending Direction

1-12 of 18

Page:
  1. 1
  2. 2
Reg.$109 99
1500mm Track Triton TTS1500
1500mm Track
Triton TTS1500
Reg.$59 99
Angle Guide Triton TTSAG
Angle Guide
Triton TTSAG
Reg.$57 99
Carrying Bag for TTST1500 Triton TTSCB1500
Carrying Bag for TTST1500
Triton TTSCB1500
Reg.$33 99
Carrying Bag for TTSTP Triton TTSCB700
Carrying Bag for TTSTP
Triton TTSCB700
Reg.$39 99
Dust Bag Triton TTSDES
Dust Bag
Triton TTSDES
Reg.$21 00
Limit Stop FS-RSP Festool 491582
Limit Stop FS-RSP
Festool 491582
Reg.$491 00
106" Guide Rail FS 2700/2 Festool 491937
106" Guide Rail FS 2700/2
Festool 491937
Reg.$68 00
Splinterguard FS-SP 5000/T Festool 495209
Splinterguard FS-SP 5000/T
Festool 495209
Reg.$24 99
Set of 2 rail connectors Triton TTSTC
Set of 2 rail connectors
Triton TTSTC
Reg.$152 99 Promo $139 00
62’’ guide Track Kreg ACS430
62’’ guide Track
Kreg ACS430
Reg.$39 00
Set of 5 Splinter Guards SP-TS55/5 Festool 491473
Set of 5 Splinter Guards SP-TS55/5 Festool 491473
Reg.$33 00
Connector Festool 482107
Connector
Festool 482107

Set Descending Direction

1-12 of 18

Page:
  1. 1
  2. 2

A word from the boss 

Business is getting tougher! (21-05-01)

Recently, the Boss said he was very satisfied with the sustained recovery of business in the industry as well as in stores and on the Internet. However, he was concerned about some of the supply problems that are becoming more and more common today.

The popularity of working from home and very low interest rates mean that the real estate market is overheating, the construction and renovation industry is moving at high speed and the wood sector is struggling to supply demand as it continues to grow.

In the face of a strong global economic recovery, a large bubble is swelling due to a lack of inventory, long and costly supply delays, production backlogs among manufacturers due to the scarcity of raw materials. The spiral of price increases has started to move and we have already found the big culprit for all this: Covid of course.

For us, the factory dispatch dates for the majority of our import orders are between 6 and 12 months. Therefore, if you had plans for 2021, arm yourself with patience.

Fortunately, vaccination is slowly making its way and we can start dreaming of a return to a semblance of normal life in the summer. Unfortunately, there is no vaccine to speed up the delivery of back orders as well as the maintenance of price stability.

Get vaccinated, it's free and you can enjoy the summer!