Normand

Since 1950
Home Categories Shop machines Routing tables Accessories

Accessories

Set Descending Direction

1-12 of 19

Page:
  1. 1
  2. 2
Reg.$30 99
Mobility Kit for Stand
Mobility Kit for Stand
Steel City
Reg.$151 99
Aluminum Mounting Plate
Aluminum Mounting Plate
Steel City
Reg.$339 99
Router Table Module Triton TWX7RT001
Router Table Module
Triton TWX7RT001
Reg.$599 99
10’’ Contractor Saw Module Triton TWX7CS001
10’’ Contractor Saw Module
Triton TWX7CS001
Reg.$44 99
Outfeed Support Triton TWX7OS
Outfeed Support
Triton TWX7OS
Reg.$64 99
Lateral Support Triton TWX7SS
Lateral Support
Triton TWX7SS
Reg.$69 99
Rugged Transit Kit Triton TWX7RTK
Rugged Transit Kit
Triton TWX7RTK
Reg.$63 99 Promo $59 95
48’’ Combo Track Kreg KMS7448
48’’ Combo Track
Kreg KMS7448
Reg.$28 99
Insert Plate Levelers Kreg PRS3040
Insert Plate Levelers
Kreg PRS3040
Reg.$42 99 Promo $39 95
Precision Router Table Stop Kreg PRS7850
Precision Router Table Stop
Kreg PRS7850
Reg.$34 99
Manual Switch 15A-110V Steel City 47-093
Manual Switch 15A-110V
Steel City 47-093
Reg.$7 99
3-1/4" Reduction Shim
3-1/4" Reduction Shim
Steel City

Set Descending Direction

1-12 of 19

Page:
  1. 1
  2. 2

A word from the boss 

Business is getting tougher! (21-05-01)

Recently, the Boss said he was very satisfied with the sustained recovery of business in the industry as well as in stores and on the Internet. However, he was concerned about some of the supply problems that are becoming more and more common today.

The popularity of working from home and very low interest rates mean that the real estate market is overheating, the construction and renovation industry is moving at high speed and the wood sector is struggling to supply demand as it continues to grow.

In the face of a strong global economic recovery, a large bubble is swelling due to a lack of inventory, long and costly supply delays, production backlogs among manufacturers due to the scarcity of raw materials. The spiral of price increases has started to move and we have already found the big culprit for all this: Covid of course.

For us, the factory dispatch dates for the majority of our import orders are between 6 and 12 months. Therefore, if you had plans for 2021, arm yourself with patience.

Fortunately, vaccination is slowly making its way and we can start dreaming of a return to a semblance of normal life in the summer. Unfortunately, there is no vaccine to speed up the delivery of back orders as well as the maintenance of price stability.

Get vaccinated, it's free and you can enjoy the summer!